|
535 Mission Street is an office skyscraper in the South of Market district of San Francisco, California, opened in November 2014, with 27 stories rising above street level.〔(【引用サイトリンク】title=Boston Properties Announces Acquisition of 535 Mission Street in San Francisco and Agreement to Acquire the Last Remaining Development Site in Reston Town Center )〕 It is adjacent to the Transbay Transit Center site and located on the same block as 100 First Plaza, 555 Mission Street, and 101 Second Street. ==History== In 1984, a partnership called Bredero-Northern filed an application for a tall, 23-story office building.〔(【引用サイトリンク】title=SAN FRANCISCO PLANNING COMMISSION - MOTION NO. 17469 )〕 The Environmental Impact Report was certified in 1986, but the project was subsequently withdrawn by the developers and never built. In 1999, a new sponsor called DWI Development, Inc. proposed a 22-story, approximately tall building, which was approved in April 2000. Following the dot-com crash, Hines Interests Limited Partnership took over the project and in 2002 demolished the existing structures and built a temporary parking lot until the economy recovered.〔 With the office market slow to recover, the site was sold in 2003 to Monahan Pacific for $19.2 million, with plans to switch the development to condominiums. In 2005, the site was approved for a 35-story, tall building containing up to 273 housing units.〔 However, by 2006, citing an "overheated" residential real estate market, Monahan Pacific sold the development site to Beacon Capital Partners for $30 million, who changed the plans back to offices. Beacon broke ground on 535 Mission during the summer of 2008, driving piles and laying the building's foundation. In October, with the onset of the 2008 financial crisis, construction on the building was halted. After lying dormant for four years, the site was sold along with already purchased construction materials to Boston Properties for $71 million.〔 Boston Properties restarted construction in 2013. Topping-out ceremonies were held on January 8, 2014 and the building opened in November 2014.〔 The building was planned to attain LEED Gold status upon completion.〔 As of 2014, one third of the space was occupied by Trulia, a real estate website company.〔 The 535 Mission Project in San Francisco features a 4 sided SSG Facade install by Architectural Glass and Aluminum. 〔Ellen Rogers, ("Structural Movement" ), ''Architects Guide to Glass and Metal'', July/August 2014 , page 10 〕''San Francisco Chronicle'' architecture critic John King stated that 535 Mission Street "isn’t a masterpiece", but praised its architectural restraint, with an "unusual but understated form () is emphasized by the sleek glass skin, where sometimes, especially near dusk or dawn, each side reads as a single blue or silver pane."〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「535 Mission Street」の詳細全文を読む スポンサード リンク
|